top of page
sap-hero.webp

SAP Compliance

When Your Building
Fails SAP Targets,
We Design the Solar Strategy to Make It Pass.

Performance gaps, DER shortfalls and constrained roof space can prevent a dwelling or block from achieving Part L compliance. We design targeted, solar-led optimisation strategies to close that gap efficiently.

Discuss Your Project

The Problem

Why Buildings Fail SAP

Many projects fall short of Part L compliance because solar was treated as an afterthought rather than an engineered solution. The result: the project cannot be signed off for occupation.

Insufficient Roof Area

Available roof space cannot support required kWp capacity

Shading Limits

Surrounding structures reduce effective solar generation

Poor System Sizing

System was not optimised for compliance targets

Heat Loss Issues

Communal heat loss increases energy demand beyond solar offset

PV as Afterthought

Solar added too late in the design process to be effective

A solar-led strategy can resolve these issues without structural changes.

Our Approach

How We Get You to Compliance

We can work with your existing SAP assessor or manage the process from the ground up with our own trusted assessor team.

STEP 01
Performance Gap Review

We review the current SAP results or begin a fresh assessment if required. This identifies where the building is falling short and by how much.

STEP 02
Assessment & Scenario Development

If you already have an assessor, we coordinate and refine improvement scenarios. If not, we can appoint and manage a new SAP assessment from scratch.

STEP 03
Solar-Led Optimisation

We design the optimal PV configuration, panel placement, kWp sizing,
string layout , tailored to your building's constraints and compliance gap.

STEP 04
Compliance Delivery

We manage system specification, solar installation and final SAP alignment, taking ownership of the compliance outcome.

Where This Applies

Projects We Help

New Developments

Residential developments struggling to meet SAP targets

Flat Conversions

Block conversions with limited roof capacity

Extensions

Extensions requiring updated SAP calculations

Renovations

Renovation projects triggering Part L compliance

Deliverables

What You Receive

Solar Optimisation Strategy

Full strategy tailored to your project's compliance gap

kWp Configuration

Recommended kWp configuration and system layout

Managed SAP Pathway

Coordinated SAP pathway, new or existing assessment

Implementation Plan

Clear implementation and
delivery plan

Coordinated Installation

PV installation managed to ensure compliance

Compliance Outcome

We take ownership of the SAP compliance result

Case Example

North London Residential Block

We can work with your existing SAP assessor or manage the process from the ground up with our own trusted assessor team.

If you already have an assessor, we coordinate and refine improvement scenarios. If not, we can appoint and manage a new SAP assessment from scratch.

100%

SAP Compliant

0

Structural Changes

Hybrid

Solar Strategy

Read Full Case Study

Frequently asked questions

Resolve Your SAP Shortfall

If your project is underperforming, send us:
SAP worksheet or summary report • Floor plans & roof layout • Assessor contact details

We will review the gap and propose a solar-led optimisation strategy.

bottom of page